Consulting Experiences
Sample of Experiences
buy amoxicillin for dogs uk
buy amoxicillin atwill.com amoxicillin ukAmoxicillin Online
buy amoxicillin australia redirect amoxicillin onlinebuy naltrexone uk
buy naltrexone online mirkamali.ir where to buy naltrexone in uktamoxifen davis pdf
tamoxifen uk blog.keylink.rs tamoxifen uk pctclomid uk sale
buy clomid uk go buy clomid bodybuildingbuy accutane uk
buy accutane pillsprednisolone without prescription
prednisolone pharmacy developersalley.com buy prednisolone liquidantibiotics for bronchitis
antibiotics for bronchitisbuy accutane singapore
accutane without dermatologist read here buy accutane onlinenaltrexone where to buy
buy naltrexone online open buy naltrexone online usaClient : Kuwait Energy Egypt “KEE”
Project: East Ras Qatar, Burg El-Arab, Abu-Sennan, and Area-A Oil Fields Reserves Estimate Study
Value : By applying the top most technology in Oil & Gas industry in this project, KEE managed to achieve the following:
Created consistent methodology for calculating the reserves for their assets. Categorize the reserves as per the standard guide lines by the society of petroleum engineers Society of Petroleum Engineering – Petroleum Resource Management System (SPE PRMS) dated March 2007”. On job training for their engineers.
Client : Gemsa Oil Company “GEMPTCO”
Project: Zaafarana Water Management Study
Value : By applying an integrated workflow between the subsurface team, the client managed to:
Determine which zones in the reservoir those have potential to be completed, Determine which areas in the reservoir that have bypassed oil, Determine best location for infill drilling.
Client : VE-GAS Company
Project: Horus Engineering Study
Value : By applying an integrated workflow between the subsurface team, the client managed to:
Calculate the reserves for Horus oil field.
Categorize the reserves as per the standard guide lines by the society of petroleum engineers “Society of Petroleum Engineering – Petroleum
Resource Management System (SPE PRMS) dated March 2007”.
Determine which zones in the reservoir those have potential to be completed,
Determine which areas in the reservoir that have bypassed oil,
Determine best location for infill drilling.
On job training for their engineers.