Sample of Experiences

buy amoxicillin for dogs uk

buy amoxicillin atwill.com amoxicillin uk

Amoxicillin Online

buy amoxicillin australia redirect amoxicillin online

buy naltrexone uk

buy naltrexone online mirkamali.ir where to buy naltrexone in uk

tamoxifen davis pdf

tamoxifen uk blog.keylink.rs tamoxifen uk pct

clomid uk sale

buy clomid uk go buy clomid bodybuilding

buy accutane uk

buy accutane pills

prednisolone without prescription

prednisolone pharmacy developersalley.com buy prednisolone liquid

antibiotics for bronchitis

antibiotics for bronchitis

buy accutane singapore

accutane without dermatologist read here buy accutane online

naltrexone where to buy

buy naltrexone online open buy naltrexone online usa

Client : Kuwait Energy Egypt “KEE”

Project: East Ras Qatar, Burg El-Arab, Abu-Sennan, and Area-A Oil Fields Reserves Estimate Study

Value : By applying the top most technology in Oil & Gas industry in this project, KEE managed to achieve the following:

Created consistent methodology for calculating the reserves for their assets. Categorize the reserves as per the standard guide lines by the society of petroleum engineers Society of Petroleum Engineering – Petroleum Resource Management System (SPE PRMS) dated March 2007”. On job training for their engineers.


Client : Gemsa Oil Company “GEMPTCO”

Project: Zaafarana Water Management Study

Value : By applying an integrated workflow between the subsurface team, the client managed to:

Determine which zones in the reservoir those have potential to be completed, Determine which areas in the reservoir that have bypassed oil, Determine best location for infill drilling.


Client : VE-GAS Company

Project: Horus Engineering Study

Value : By applying an integrated workflow between the subsurface team, the client managed to:


Calculate the reserves for Horus oil field.

Categorize the reserves as per the standard guide lines by the society of petroleum engineers “Society of Petroleum Engineering – Petroleum

Resource Management System (SPE PRMS) dated March 2007”.

Determine which zones in the reservoir those have potential to be completed,

Determine which areas in the reservoir that have bypassed oil,

Determine best location for infill drilling.

On job training for their engineers.