Operate the crusher with its design capacity تشغيل الكسارة
Course Schedule
Operate the crusher with its design capacity تشغيل الكسارة
The Suggested Reserve Capacity for Quarry Operation
Applies As well to open –pit Mining Operations employing power shovels for
loading the ore. Usually the original crusher is expected to produce the
required daily tonnage in such plants in one or two shifts. But this can only
be accomplished by overtime operation of pit, transportation and primary
crusher –house wich under existing labour conditions is costly.
The fundamental goal for the design of a crushing
plant is an installation that meets the required production requirements,
operates at competitive cost, complies with today’s tough environmental
regulations, and can be built at a reasonable price despite the rising
Cost of equipment energy and construction labor.
·
Rising energy costs are causing owners to increase the integration of
mine and mill design, so that they can identify ways of reducing overall
electrical power consumption
·
Electronic control of crusher discharge opening and feed rate. With
adjustment of acrusher’s discharge opening, as the production continues through
an on-line coarse size analysis of the crushed product (digital image
analyses). Dance, A. 2001)
·
More attention is being paid to the impact on crushing circuit design
caused by variations in ore characteristics, size distribution, moisture
content, ore grade and climatic conditions
· Operators have always
dreamed of reducing the need for crushing equipment; when SAG mills were first
introduced, it was hoped that they would eliminate secondary and tertiary
circuits.
1. An Introduction
·
Basic definitions
·
Minerals by value
·
The process frame of minerals
·
Mineral processing and hardness
·
Size and hardness
·
The stress forces of rock mechanics
2. Minerals in operation
·
Operation stages
·
Operation – dry or wet
·
Mining and quarry fronts
·
Natural fronts
·
Size reduction
·
Size control
·
Enrichment – washing
·
Enrichment – separation
·
Upgrading
·
Materials handling
·
Wear in operation
·
Operation and environment
·
Operation values
3. Size reduction
·
The size reduction process
·
Feed material
·
Reduction ratio
·
The art of crushing
·
Crushing of rock and gravel
·
Crushing of ore and minerals
·
Crushing – calculation of reduction
ratio
·
Selection of crushers
·
Primary crusher
·
Primary crusher – sizing
·
Secondary crusher – type
·
Cone crusher – a powerful concept
·
Secondary crusher – sizing
·
Final crushing stage – more than just
crushing
·
VSI – a rock protected impactor
·
High Pressure Grinding Rolls (HPGRs) -
HRC
·
Final crusher – sizing
·
Wet crushing prior to grinding
4. Size control
·
Size control – introduction
·
Size control by duties
·
Size control by methods_ Screens
Screening by stratification
·
Screening by free fall Screen types
·
Screen capacities_
·
Selection of screening media
·
Particle size – mesh or micron?
·
Technical data: Single inclination
screen – circular motion
·
Technical data: Double inclination
screen – linear motion
·
Technical data: Triple inclination
screen – linear motion
·
Technical data: Multiple inclination
screen – linear motion
·
Classification – introduction
·
Wet classification – fundamentals
·
Hydrocyclone
·
Spiral classifiers
·
Dry classification – introduction_
·
Static classifiers
·
Dynamic classifiers
·
Ancillary air solutions Dry grinding
·
Size control in crushing and grinding
circuits
5. Operations Design
considerations
·
Wet HGMS/F – magnet design
·
Wet HGMS, HGMF – separator types
·
Wet cyclic HGMS
·
BASICS IN MINERAL PROCESSING
·
Wet cyclic HGMS – process system
·
Wet cyclic HGMS – operation
·
Wet cyclic HGMS – applications
·
Wet cyclic HGMS – sizing
·
Technical data: Wet cyclic HGMS
·
Wet cyclic high gradiant magnetic
filter HGMF
·
HGMF – applications.
6. Troubleshooting table
for field types
Sub Code | CI023 |
Start Date | Sun,Apr,17,2022 |
End Date | Thu,Apr,21,2022 |
Duration | 5 Days |
Fee(US$) | 2950 |
Location | Riyadh |
Reminder |